Guildford Resin Driveways

Driveway resurfacing with resin bound

Resurfacing replaces a worn driveway surface with a new one. With resin bound, the key decision is whether your existing base is good enough to overlay or needs to be dug out and rebuilt. That single decision drives most of the difference between quotes.

Speak to a resin specialist

No obligation. Tell us about the job and a vetted local installer will be in touch by email.

We pass your enquiry to one vetted installer covering your postcode, who contacts you to arrange a site visit and written quotation. We do not sell your details to anyone else. See our privacy policy.

In short: overlay when the existing concrete or tarmac is sound, stable and laid to falls; rebuild when it has sunk, broken up, is block paving or gravel, or when you want the drive to drain to ground. An overlay is quicker and cheaper; a rebuild costs more but resets the drive's structure and can make it fully permeable.

Overlay or rebuild: how to tell

Your current drive Usual route
Sound tarmac, firm, few defects Overlay after repairs
Sound concrete, few cracks, good falls Overlay after crack and joint treatment
Tarmac or concrete that has sunk, rutted or broken up Rebuild
Block paving Lift and rebuild
Gravel, soil or grass New build-up
Any surface where you want drainage to ground Permeable rebuild

What a rebuild involves

Excavation of the old surface and soft material, a geotextile, a compacted sub-base (open-graded Type 3 or 4/20 for permeable builds), a binder course (often permeable macadam), edge restraint, then the resin bound layer. Government guidance puts typical driveway construction at 200 to 250 mm beneath the surface. Disposal of excavated material is part of the job, and should be in the quote.

Comparing resurfacing quotes

Quotes vary most on preparation. Two quotes for the "same" drive can describe completely different jobs: one an overlay over defects, another a full rebuild. Ask each installer to state in writing whether they are overlaying or rebuilding, why, and what each layer will be. Our installer checklist has the full list of questions.

Frequently asked questions

Can resin go over block paving?

Generally not. Blocks move independently on sand, so joints reflect through the resin as cracks. Most installers lift the blocks and lay a new base.

Can resin go over gravel?

No. Loose gravel is not a base. It is removed, or used as part of a new compacted sub-base where suitable, then a binder course is laid.

How long does resurfacing take?

An overlay on a typical drive is often one to two days once preparation is done. A full rebuild adds excavation, sub-base and binder course, so allow several days. Weather also matters, because resin should not be laid in rain, very cold or very humid conditions.

Related guides

Resin over tarmac

Turning a sound tarmac drive into a resin finish without digging out, and when it is not suitable.

Resin over concrete

When an existing concrete drive is a good base, and the cracks, joints and drainage issues to check.

Speak to a resin specialist