In short: a permeable resin driveway needs three things: a resin bound surface, a porous binder course (such as permeable macadam) and an open-graded sub-base (Type 3 or 4/20) over ground that can absorb water. Resin laid over solid concrete or dense tarmac is not permeable to ground, so it needs falls and drainage to a lawn, border, soakaway or channel.
How a permeable driveway works
| Layer | Typical material | Job |
|---|---|---|
| Surface | Resin bound aggregate, around 18 mm | Wearing course; lets water through |
| Binder course | Permeable (porous) macadam | Supports the resin; stays open to water |
| Sub-base | Open-graded Type 3 or 4/20 aggregate | Strength plus voids that store water |
| Separation | Geotextile | Stops soil migrating into the sub-base |
| Ground | Existing subgrade | Absorbs the water |
Government guidance on front-garden paving notes that conventional MOT Type 1 and hardcore contain fines that slow water down, and names open-graded 4/20 and Type 3 as the materials for permeable bases.
Why it matters
Since 1 October 2008, new or replacement impermeable front-garden surfaces over 5 m² in England need planning permission unless they drain to a permeable area within the property. A permeable driveway avoids that. It also reduces the surface water that runs into roads and drains during heavy rain; the Environment Agency's 2024 national assessment estimates 4.6 million properties in England are at risk of surface water flooding. More figures are in our statistics page.
Simple checks you can do
The government guidance describes two homeowner tests:
- Hosepipe test on a finished surface: after one or two minutes there should be no puddles and water should not run more than 200 to 300 mm across the surface.
- Pit test on the ground before building: dig a 300 mm cube, fill with water; if it takes more than 11 hours to drain, the design should include a pipe rather than relying on the ground alone.
Keeping it permeable
Silt, leaf litter and moss can clog the surface over time, slowing drainage. Regular sweeping and an occasional wash keep the voids open. Avoid storing soil or sand on the drive. See resin driveways and drainage for more.
Frequently asked questions
Is every resin bound driveway permeable?
The surface layer is porous, but whether water reaches the ground depends on the base. Over solid concrete or dense tarmac, water drains through the resin and then runs across the old surface. Ask the installer to state in writing how the drive drains.
My soil is clay. Can I still have a permeable drive?
Possibly. Heavy clay absorbs water slowly. Government guidance describes a simple pit test; where the ground drains too slowly, a permeable build-up can store water and release it through a pipe or to a soakaway. The installer should assess this on site.
Do I need planning permission for a permeable drive?
Not normally, at any size, in England. Exceptions include conservation areas with Article 4 directions, listed buildings, flats and new dropped kerbs. See our planning guide.
Related guides
Drainage and permeability
How water leaves a resin drive, what to do on clay, and the government tests for drainage.
Planning permission
The 5 m² rule, permeable surfaces, conservation areas, listed buildings and dropped kerbs.
UK driveway and paving statistics
59 sourced data points on paving, planning, flood risk, Surrey car ownership and resin specifications, with a downloadable CSV.